Feasibility study aspect
This part of the Energy Performance of Buildings Directive states:
For new buildings with a total useful floor area over 1000 m2 Member States shall ensure that the technical, environmental and economic feasibility of alternative systems such as:
- decentralised energy supply systems based on renewable energy
- CHP
- District or block heating or cooling, if available
- Heat pumps, under certain conditions,
is considered and is taken into account before construction starts.
